Aqua Line Utility Projects

Featured Projects

HULL MA: WATER MAIN SYSTEM INSTALLATION

PROJECT: WATER MAIN SYSTEM INSTALLATION

OWNER: AQUARION WATER

DETAILS:  Aqualine Utility installed over 4,000 LN FT of a new 8-inch water main system on the railroad bed by upgrading the existing 2-inch water main system that was previously installed on Nantasket Beach. We installed over 10 new fire hydrants that were never in the remote areas due to the homes at one time being beach front vacational homes. We had to reinstate over 60 homes with new water services into the homes up to the existing meters. Aqualine directional drilled over a dozen homes to save disturbances of walls , walkways and areas that could not be mechanically excavated.

WAREHAM MA: ROADSIDE PUMP STATION SEWER LINE REPLACEMENT

PROJECT: PUMP STATION SEWER LINE REPLACEMENT

OWNER: TOWN OF WAREHAM MA

DETAILS: We installed a 10-inch and 18-inch line stop at two pump station locations. Aqualine performed this work at two existing sewer pump stations for future emergency sewerage bypass connections. We had to cut into the existing force sewer mains once we shut down the stations. We installed 18-inch and 12-inch Ductile Piping with force main connections and new operating valves.

bLACKSTONE MA: CULVERT REPLACEMENT

PROJECT: CULVERT REPLACEMENT

OWNER: TOWN OF BLACKSTONE MA

DETAILS:  Aqualine Utility had to set up coffer dams with bypass pumping to handle the flows of the Fox brook. We removed the existing failed stone box culvert to replace it with a new 9 foot by 8 foot bridge concrete culvert . We installed new headwalls along with new bridge MASS DOT railings. We installed a new 12-inch water with to both sides of over 100 LN FT with 12-inch operating valves. We installed over 300 LN FT of new monolithic concrete curbing with the new sidewalk as one. We permanent paved the roadway with new slope stabilizations.

CHELSEA MA: ROADWAY SEWER LINE REPLACEMENT

PROJECT: SEWER LINE REPLACEMENT

OWNER: TOWN OF CHELSEA MA

DETAILS:  Aqualine had to work on a very tight timeline on rt 16 under MASSDOT constraints . We had to excavate remove over 1,600 tons of materials , install over 1,500 LN FT of new 8-inch Ductile water main , new fire hydrants , over 44 new water services , 10×8 tapping sleeves with operating valves. Aqualine had to flow fill the entire rt 16 trench work to meet specifications. We also installed 24-inch drain line systems along with over 1,400 LN FT of a new 12-inch drain line system and associated manholes & catch basins. We had to mill and pave over a 1,000 tons of new roadways, install thermoplastic striping.

EASTON MA: CULVERT REPLACEMENT

PROJECT: CULVERT REPLACEMENT

OWNER: TOWN OF EASTON ME

DETAILS:  Aqualine Utility removed the existing failed granite stone culvert and replaced it with a new 18 foot by 10 foot concrete bridge box culvert. We had to install coffer dams on both sides of the brook with bypass pumping. We had to relocate the existing 2-inch high pressure gas main onto a designed temporary bridge over the Mulberry Brook. We had to offset the 8-inch water main underneath the culvert , install new concrete head walls with a MASS DOT guardrail system. Aqualine had to install approach slabs in both directions of the culvert , riprap the slopes for stabilization and permanent pave the roadway.

WESTFORD MA: CULVERT REPLACEMENT

PROJECT: GROTON ROAD/ ROUTE 40-CULVERT REPLACEMENT

OWNER: TOWN OF WESTFORD

DETAILS:  INSTALLATION OF A NEW PRECAST CULVERT MANUFACTURED BY CONTECH. PROJECT INCLUDED DEMO OF EXISTING GRANITE STONE CULVERT, SETTING OF NEW EXPRESS FOOTINGS, NEW ARCHED CULVERT, NEW WING AND HEADWALLS. RECONSTRUCTION OF THE ROADWAY OVER THE AREA OF CONSTRUCTION.

NORTH ATTLEBORO MA: HOPPIN HILL DAM RECONSTRUCTION

PROJECT: HOPPIN HILL DAM RECONSTRUCTION

OWNER: TOWN OF NORTH ATTLEBORO

DETAILS:  INSTALLATION OF A NEW PRECAST SPILLWAY CHANNEL, CONSTRUCTION OF NEW CAST IN PLACE CONCRETE SPILLWAY INLET STRUCTURE, INSTALLATION OF NEW SLUICE GATE, NEW STEEL PEDESTRIAN BRIDGE, IMPORTATION GRADING OF APPROX 15,000 TN OF EMBANKMENT MATERIAL TO BROADEN THE CROSS SECTION OF THE DAM.

SCITUATE ME: CHAIN POND AND SAND HILLS PUMP STATION REHABILITATION

PROJECT: CHAIN POND AND SAND HILLS PUMP STATIONS

OWNER: TOWN OF SCITUATE

DETAILS:  INSTALLATION OF A NEW 10′ DIAMETER PRECAST WET WELL, NEW PRECAST VALVE VAULT, ASSOCIATED VALVES AND PIPING, 2 NEW SUBMERSIBLE FLYGT PUMPS ON SLIDE RAILS, NEW CONTROL PANELS AND SCADA UPGRADES, NEW 24″ CAST IRON SLUICE GATE, 14″ LINE STOP ON THE STATIONS FORCEMAIN, BYPASS OF THE STATIONS FLOWS UP TO 1 MGD.

GLOUCESTER MA: ANNISQUAM RIVER WATER MAIN CROSSING

PROJECT: ANNISQUAM RIVER WATER MAIN CROSSING

OWNER: CITY OF GLOUCESTER

DETAILS: DIRECTIONAL DRILL 20″ WATER MAIN ACROSS ANNISQUAM RIVER APPROXIMATELY 2265 LINEAR FEET AND EXCAVATE AND INSTALL 1,100 OF 20″ PVC PIPE. INSTALLATION OF 5- 20″ GATE VALVES PLUS VARIOUS BENDS TO MAKE CONNECTION BETWEEN BOTH SIDES OF THE RIVER.

MASSDOT: HYDRANT & FIRE PROTECTION WATER MAIN REPLACEMENT

PROJECT: MASSDOT- HYDRANT AND FIRE PROTECTION WATER MAIN REPLACEMENT ALONG A SECTION OF THE SOUTH BOSTON BYPASS AND I-93 FRONTAGE ROADS

OWNER: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION

DETAILS: CLEAN, VIDEO & CURE IN PLACE OF 3,700 LINEAR FEET OF EXISTING 12″ WATER MAIN. INSTALLATION OF 225 LINEAR FEET OF 6″ HDPE AND 925 LINEAR FEET OF 12″ HDPE WATER MAIN, 6″ & 12″ GATE VALVES, AND HYDRANTS. MILL & OVERLAY OF 9,750 SY OF ROADWAY WITH 1,600 TONS OF ASPHALT.

MASS DHC: CULVERT REPLACEMENT PROJECT

PROJECT: CULVERT REPLACEMENT PROJECT

OWNER: MASSACHUSETTS DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT

DETAILS: REPLACEMENT OF EXISTING STREAM CROSSING WITH PRECAST CONCRETE BOX CULVERT AND CAST-IN-PLACE CONCRETE HEAD WALLS INCLUDING FOOTINGS AND GUARDRAILS. FULL DEPTH RECONSTRUCTION OF CULVERT BEDDING AND BITUMINOUS CONCRETE DRIVE AND PARKING AREA PAVEMENT. ASSOCIATED UTILITY AND SITE WORK.