CULVERT REPLACEMENT

PROJECT: GROTON ROAD/ ROUTE 40-CULVERT REPLACEMENT

OWNER: TOWN OF WESTFORD

LOCATION: KEYES BROOK - WESTFORD, MA

DETAILS:  INSTALLATION OF A NEW PRECAST CULVERT MANUFACTURED BY CONTECH. PROJECT INCLUDED DEMO OF EXISTING GRANITE STONE CULVERT, SETTING OF NEW EXPRESS FOOTINGS, NEW ARCHED CULVERT, NEW WING AND HEADWALLS. RECONSTRUCTION OF THE ROADWAY OVER THE AREA OF CONSTRUCTION. 

HOPPIN HILL DAM RECONSTRUCTION

PROJECT: HOPPIN HILL DAM RECONSTRUCTION

OWNER: TOWN OF NORTH ATTLEBORO

LOCATION: HOPPIN HILL DAM, ATTLEBORO, MA

DETAILS:  INSTALLATION OF A NEW PRECAST SPILLWAY CHANNEL, CONSTRUCTION OF NEW CAST IN PLACE CONCRETE SPILLWAY INLET STRUCTURE, INSTALLATION OF NEW SLUICE GATE, NEW STEEL PEDESTRIAN BRIDGE, IMPORTATION GRADING OF APPROX 15,000 TN OF EMBANKMENT MATERIAL TO BROADEN THE CROSS SECTION OF THE DAM. 

CHAIN POND AND SAND HILLS PUMP STATION REHABILITATION

PROJECT: CHAIN POND AND SAND HILLS PUMP STATIONS

OWNER: TOWN OF SCITUATE

LOCATION: SCITUATE, MA

DETAILS:  INSTALLATION OF A NEW 10' DIAMETER PRECAST WET WELL, NEW PRECAST VALVE VAULT, ASSOCIATED VALVES AND PIPING, 2 NEW SUBMERSIBLE FLYGT PUMPS ON SLIDE RAILS, NEW CONTROL PANELS AND SCADA UPGRADES, NEW 24" CAST IRON SLUICE GATE, 14" LINE STOP ON THE STATIONS FORCEMAIN, BYPASS OF THE STATIONS FLOWS UP TO 1 MGD. 

ANNISQUAM RIVER WATER MAIN CROSSING

PROJECT: ANNISQUAM RIVER WATER MAIN CROSSING

OWNER: CITY OF GLOUCESTER

LOCATION: GLOUCESTER, MA

DETAILS: DIRECTIONAL DRILL 20" WATER MAIN ACROSS ANNISQUAM RIVER APPROXIMATELY 2265 LINEAR FEET AND EXCAVATE AND INSTALL 1,100 OF 20" PVC PIPE. INSTALLATION OF 5- 20" GATE VALVES PLUS VARIOUS BENDS TO MAKE CONNECTION BETWEEN BOTH SIDES OF THE RIVER.

MASSDOT- HYDRANT & FIRE PROTECTION WATER MAIN REPLACEMENT

PROJECT: MASSDOT- HYDRANT AND FIRE PROTECTION WATER MAIN REPLACEMENT ALONG A SECTION OF THE SOUTH BOSTON BYPASS AND I-93 FRONTAGE ROADS

OWNER: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION

LOCATION: CITY OF BOSTON

DETAILS: CLEAN, VIDEO & CURE IN PLACE OF 3,700 LINEAR FEET OF EXISTING 12" WATER MAIN. INSTALLATION OF 225 LINEAR FEET OF 6" HDPE AND 925 LINEAR FEET OF 12" HDPE WATER MAIN, 6" & 12" GATE VALVES, AND HYDRANTS. MILL & OVERLAY OF 9,750 SY OF ROADWAY WITH 1,600 TONS OF ASPHALT.

CULVERT REPLACEMENT PROJECT

PROJECT: CULVERT REPLACEMENT PROJECT

OWNER: MASSACHUSETTS DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT

LOCATION: GLOUCESTER, MA

DETAILS: REPLACEMENT OF EXISTING STREAM CROSSING WITH PRECAST CONCRETE BOX CULVERT AND CAST-IN-PLACE CONCRETE HEAD WALLS INCLUDING FOOTINGS AND GUARDRAILS. FULL DEPTH RECONSTRUCTION OF CULVERT BEDDING AND BITUMINOUS CONCRETE DRIVE AND PARKING AREA PAVEMENT. ASSOCIATED UTILITY AND SITE WORK.